Yup
Didn't do much over the weekend, but this afternoon was productive, none the less. Both res, flow indicators, NB and CPU blocks needs sealing between the layers, all the barbs are sealed in their places. One res is mounted on the hinges, and after sealing will be mounted into the place, gotta drill one more hole for securing bolt that will not let the res swing on the hinges. The initial idea (that kickass magnet from broken hdd) didn't work, I had to come up with somethin else. Cpu bases need lapping and thats (almost) it
I'll post more piccies of the two sets when I finish them all
Soon I hope
Cheers!