I am going to pick up a 2500+ Barton from the local store if they are in stock for my main box. This will free up the 1700+ Tbred for testing with the chiller and water cooling setups tomorrow. I will have to wait a bit for the thermal epoxy to dry but should otherwise be ready for action tomorrow afternoon KE. I didn't get ANYTHING done (was grading papers) so it will be a long evening/night of setup and tests. Should be interesting though.
|