Quote:
Originally Posted by unregistered
jd, both you and Rotor could have developed first rate wbs
- but it takes one hellofalot of effort to do so, prototyping and testing
as the Cooling God said, bring it on
|
I hope not to disappoint. If all goes well and my parts arrive before Thanksgiving I will have 4 days of nothing but mill time to finish these blocks during Thanksgiving. I will then test them the best I can and decide if they are fit to send to pH. Hope to have them to him by the end of the year. I got everything coded (I hope) so all I need is material, tooling, and replacement mill parts. All on order.