Glad to hear you're still going. Copper is expensive.
I just got mine, but I'm taking a different approach than you. I got some 3/16" plate for the top and bottom, and 3' of 1/2" wide x 1/4" thick bar for the sides. I figure I can cut it to length and make the middle "box" out of it. Then have a piece of the bar running down the center so the water has to move in U to get around the block. I'll post details when I get to it. It'll be fun tryign to solder all that crap together I suspect.
__________________
Goliath: 3.4E@3.91/Abit IC7, Maze4 (temporarily) + custom splitter to crazy 4-way watercooling parallel loop: X800XT @ 520/1280 + AC Twinplex, AC Twinplex Northbridge, Silenstar Dual HDD Cooler, Eheim1250, '85 econoline van HC + 2x120, 1x120 exhaust - polished aluminum frame panaflo L1As, 2x18GB 10K RPM U160 SCSI, 4GB PC4000.
I wanna be BladeRunner when I grow up!
Project Goliath - nearing completion.
|