Today didn't get as far along as I'd hoped... (social responsibilities ... read:wife

)
I did get the block halves lined up, drilled and tapped for the four main cap screws... Front half...
Back half...
I should be ready to mill the back sides of each block where they sandwich the card tomorrow...
The rest of today I spent with my dremel
I cut out the rough opening for the power supply water block to slide in...
Here is the rough fit... still need to widen the back area where the copper pipe/tube is at so it will slide in to the mounting points.
That's all for today... tomorrow we may be removing a large quantity of copper... so bring your shovel.