Well, not so much done today... Got most of the components in the box for test fitting and hose routing...
Laying out the hose... measureing and cutting a little long...
Then we start trimming hose back... and putting it on each copper tube... (DAMN hard to do too!!!

as each tube is 1/2" Outer Diameter and so is the vinyl tubing! )
Then it was off to the water lab ( Kitchen ) for some flow testing and triple check for leaks. (one REALLY slow pinhole in the drive cage... gotta torch that tomorrow)
The flow through the Power Supply/Video Card/Hard Drive Cage is just over a trickle as the CPU block is not very restrictive. I may put a small valve in the line to adjust the balance of the system... we will see.
Also need a LOT easier way to fill, drain and bleed the system. I'll think more on that tomorrow... I need sleep. G'night all...