View Single Post
Unread 05-12-2004, 07:01 PM   #22
Blackeagle
Thermophile
 
Join Date: Oct 2002
Location: U.S.A = Michigan
Posts: 1,243
Default

The MD20Z is here.

It first came on Monday, but no one here to sign for it. I didn't have time yesterday to get to the post office so I had to wait for today, enough to make me crazier than I already was.

I wan't eveyone to know that Skulemate is very good to do a deal with. Very prompt in his responses, and to the point in his dealings.

The pump came packaged better than anything I've ever purchased before, from a individual or company. He warned me I'd need a knife to get to it......I did, but far better safe than sorry. I've always taken care when shipping anything to anyone, but he really packed it well. The pump & the other components (spare parts) were all wrapped in bubble wrap which was then taped to insure it could not come off the pump or the other smaller packings of parts. Then as he packed the pump and parts into a box he included wadded newspaper to keep the differant packs from banging aginst each other of being otherwise bounced around during shipping to me.

Thanks Skulemate for a great job of shipping and a very fair deal.

The Antec case I ordered, and which arrived last week, didn't fair so well at the hands of UPS. Now awaiting a new bezel from Directron, who didn't give me any hassels at all, just wanted to know if I needed a whole new case or what, so cheers to them as well.

Last edited by Blackeagle; 05-12-2004 at 07:08 PM.
Blackeagle is offline   Reply With Quote