Thread: full test
View Single Post
Unread 10-02-2004, 05:21 PM   #17
Uncle`BuZZ
Cooling Neophyte
 
Join Date: Oct 2004
Location: France
Posts: 28
Default

Quote:
Originally Posted by unregistered
the difficulty is the equipment having the requisite capability, and the time
even using an environmental chamber as we do now, the time required is prodigious
I'm testing rads now and its 2 hours for a 'hot' change (i.e. a simple fan change) to 5 hours from a cold start
- who has that kind of time ? (why I'm here on Saturday posting on procooling, lol)
Serious manufacturers maybe ?

I know it's difficult, but it could be amazing to have all this data !
Uncle`BuZZ is offline   Reply With Quote