View Single Post
Unread 07-08-2005, 05:08 AM   #38
Cyprio
Cooling Neophyte
 
Join Date: Jun 2005
Location: London, UK
Posts: 47
Default

Update:

Cutting to make room for the rad's fan:



Cut finished and c-strip added to the egdes:



Testing the positioning of the rad and fan:



note: That will be a PAPST (AKASA one is going to replace a case fan )

Rad complete for installation:



I had some spare foam from the bottom of the rad so i added it around the shroud to make it airtight.

Added a bit of duck tape to the bottom to hide nasty rough edges:



This is how i placed the pump and routed the outlet straight down to the rad:



The pump and T-piece that is going to be connected to a DD fillport (awaiting more jubilee clips to finish this!). You can also see the rad outlet coming up.



And the two water blocks (that is a polarflo TT for the gfx) with heatshrink over the jubilee clips:



Question: How much of a difference will blowing out have than pulling air in? I am still worried about dust.

Thanks!

Next update tomorrow probably.
__________________
::BR:: - A Gaming Community
www.brclan.co.uk

Last edited by Cyprio; 07-08-2005 at 05:19 AM.
Cyprio is offline   Reply With Quote