View Single Post
Unread 03-22-2006, 04:04 PM   #16
DX2
Cooling Neophyte
 
DX2's Avatar
 
Join Date: Oct 2005
Location: Würzburg, Germany
Posts: 18
Default Re: Bushman-Tech WB - initial construction info

i hadn't really thought the testing process through thoroughly, and didnt realise how many things i hadn't considered.

The thing i had thought about was making the test results comparable to each other. hence in the early tests i wanted to place the block on the stove , say 3 times, and inbetween reset the setup and run it from scratch. and see if the results are comparable. if not then theres really no point in continuing with the stove approach. If they are then all i really wanted to know if how various block features affect performance. eg, base thickness, fin height, holes Yes/no/number. all id want is to know if the water is being heated better or worse, in comparison to the previous block config.

For proper testing, and thus results comparable to other blocks and have REAL performance data ill surely have to seek other avenues of testing. Who knows, perhpas pHaestus. would be willing to put the block in his test setup . But its a long road till im ready for that.

Last edited by DX2; 03-22-2006 at 04:33 PM.
DX2 is offline   Reply With Quote