my "test rig" consisted of nothing more than a pump the T-line and the closed loop! nothing more!
i was just testing the effectiveness of the bleeding line..and which orientation worked best. and yes, each time, the T-connector was at the highest point of the rig!
btw, that image was from this procooling article
http://www.procooling.com/articles/h...system_2.shtml
it was written by Joe (of procooling) if i'm not mistaken. and that was the loop he recommended. with the water coming from the bottom, then sucked out from the side. whereas the one you guys recommended had the water coming from the side and going down into the rest of the loop. as I said, from what i tried, it seemed like Joe's setup worked better for me..
any thoughts?