I'm not sure how this will work but this is what I am planning to do.
Components:
Blocks:
1 X DD MazeII
2 X oc-wc 40mm blocks (chipst and geforce II pro 64ddr)
Pump:
Magdrive 3 350
Res:
4"X4"X4" Reservoir
Radiator:
Black Ice Rad
Tubing:
PVC 3/8 id, 1/2 o/d
PVC 1/4 id, 3/8 od
Connectors:
All high flow connectors from liquidcool.org
I plan in going from res to pump with the 3/8 id tubing,to the rad then going out the rad and splitting via a "T". One flow continueing to use the 3/8 id to the CPU, the other reducing down to the 1/4 id for the small blocks. The GPU first then the north bridge. Both splits will reenter the res by themselves, with their respective size tubing.
__________________
Water Cooled Inwin Q500 (Dual Rads: Rad1 = DTEK Pro Core | Rad2 = Blick Ice Estreme, Hydor L30, Dangerden Maze2, Bay Res Typhoon Reservoir, 1/2 " DD Tygon Thick Wall Hose).
Flow: Res, Pump, CPU watervlock, Y into both rads, both rads into res independently.
Athlon XP 1800+ (@ 1731 - 150mhz fsb.), on a Asus A7N266-c, and a Radeon 9000 *waiting for RMA'd Saphire 9800 ultra from Newegg)
|