View Single Post
Unread 07-13-2002, 02:44 PM   #1
Nomad2000
Cooling Neophyte
 
Join Date: Apr 2002
Posts: 56
Default Filling - from where?

Consider the following possibilities of filling system (a reservoir is the highest point, the inlet is higher than the outlet).
1. Through a hole in the lid of the reservoir.
2. Through "T connection" - in the inlet of the reservoir.
3. Through "T connection" - in the outlet of the reservour.
4. Through "T connection" - in another point - where?

What way is better?
Thank everybody.
Nomad2000 is offline   Reply With Quote