Quote:
Yeah, mine is rated at 4315L/hr zero head 1" fittings, its rating at 6' verticle rise is 2400L/hr. It's max head is 15 feet.
You're not rising much in the pic, about two feet tops with the 6 feet of tubing, correct?
|
Yea, I'm only at 1.5-2 feet of head there, the flow drops off pretty quickly if I lift the hose all the way up, I'll have to be aware of that when I put it into action.
Started on my 1 inch block, I'm using the base from the dual 1/2'' block and I've drilled a 1/2'' hole right where the core contacts the block, I've then inserted a truck load of thin copper wire untill the hole was packed solid, then soldered it up.
the last pic shows the wire all in position with the partially finished top of the block.