Quote:
Originally posted by Volenti
Started on my 1 inch block, I'm using the base from the dual 1/2'' block and I've drilled a 1/2'' hole right where the core contacts the block, I've then inserted a truck load of thin copper wire untill the hole was packed solid, then soldered it up.
|
Wouldn't the water flowing across the wires cause them to "bunch up", thereby reducing the efficiency of the set-up? Would it not work better if the water inlet was at the top, blowing down into the "forest" of wire?
Just some thoughts...
Bob