View Single Post
Unread 08-29-2002, 07:24 PM   #43
Bruno Facca
Cooling Neophyte
 
Join Date: Jul 2002
Location: Brazil
Posts: 70
Default

The model should have been ready for today but after testing the model (to see if it really molds well and it did) I ran out of molding material (stupid! stupid! stupid!) so I'll have to go out of town tomorrow and buy some, this will take most of the day so I will only cast the prototype on saturday. I'm really anxious here to get this thing working on my PC (for testing purposes), you have no idea..

I'm not sure how long will it take for me to make all the tests necessary (some tests to determine if the water is running as it was designed to be, performance tests in overclocked XP and P4, high pressure test for leaks..) but it shouldn't be much, like 3 to 10 days depending on how things go (counting from saturday).

Thanks

Bruno Facca
Bruno Facca is offline   Reply With Quote