Quote:
Originally posted by zCereal
lemme do a little math here
to test all optimal set-ups we would have to have about let's say 4 different pumps to respressent certain flow rates
let's say 12 rads to test (including a heatercore or two)
and then you'd need to test the 19 waterblocks on each set-up
which means 912 different combinations
testing each 3 times for elimating sources of error like mounting
that is 2736 tests
now take that and let's say 1 hour per test to test load temps and take measurements and put on the block
that's 2736 hours of testing or 114 days of 24/7 testing of waterblocks
unfeasible
so leave it down to 1 variable
then you gotta run 19 tests at 3 times each
which mean alot less work and results that may not reflect all possible results but does give a very good indication of which blocks are the best performers
|
1 good core
1 pump at 10 different flow rates
repeated 3 times
19 blocks
That's 57 mountings of a block, followed by 10 different flow rate tests for each.
Who ever said that only one person had to do this?