I have been playing with 1 hour per point at 0.5, 1, 1.5, 2, 2.5 gpm. That's 6 hours by the time all the fiddling with flow rate adjustment and fan speed is done. I am limited to Saturday and Sunday tests as a result (I stay up laaaate those nights anyway). Automation would be a worthwhile topic for your test design. Costs big bucks to do right though (ask Bill how he likes Labview too).
|