Quote:
Originally posted by Blackeagle


Jaydee,

What do you think of this idea? Advice a further suggestions would be great.
The problems I see is you will be restricted to having the hose barbs on the same side of the block. Which will pretty much destroy my theory on flow through my pin desing. This can easily be worked around with a few changes though. Namely a wall down the middle of the block. No big deal.

Next problem, and more importantly, I see is the connectors maybe to close together. I always figure about 7/16" for gap for 1/2" barbs. 1/8" for each hose so thats 1/4" plus 1/16" for meatal hose clamps x2 = 3/8" plus another 1/16" to be able to move the clamps around.....

If those things can be worked around it should be good. Might even be doable with my mill.